What is difference between limit state and working stress method? How it is applies in building structure.

Answers were Sorted based on User's Feedback



What is difference between limit state and working stress method? How it is applies in building stru..

Answer / bilal riaz chughtai

a limti state mehtod is a condition beyound which structure no longer fulfill the design criteria.
in working stress method it is assumed that plane section in bending will remain plane after bending.
stress strain relationships will obey hookx law.

Is This Answer Correct ?    8 Yes 2 No

What is difference between limit state and working stress method? How it is applies in building stru..

Answer / rethina kumar

working stress method is classical method to design structure element. for ie:- if we design beam (r) any other element its reinforcement requirement will be more than actual requirement. 
in limit state method design will be based on factored load. reinforcement will be corresponding factored load. design section and Ast can use economically.

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

1 Answers  


How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?

0 Answers   First MicroFinance Bank FMFB,


brickwork labour rate per cum ?

1 Answers   MEIL,


10x10 slab design

1 Answers  


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1 Answers  


How much wastage we considered for cement

6 Answers   Jain Housing, L&T,


How many 6.5 * 6.5 tiles would i need for a 36-sqaure-foot room?

3 Answers  


How many feet are in 4 square yards?

1 Answers  


How do you determine specific gravity of cement?

1 Answers  


What is the standard volume of pharma in cub ft

1 Answers   Deepa Constructions,


what is the procedure for batching plant calibration??????

1 Answers   BCET,


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)