how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
No Answer is Posted For this Question
Be the First to Post Answer
how to estimate shuttering form work or how to take off material quantity???
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
The name Taapsee Pannu is associated with which film A) baar baar Dekho B) freaky Ali C) Rustom D) pink
concrete strenght is increased if using sisal fibre in concrete?
What is minimum tensile strength required for structural steel works ?
how to calculate length of bar
whats is difference between anchorage length and development length
why shear reinforcement is not provided in the design of footing?
what is the praposion of M30 concrete mix.
What is Time period of a building and its relation with frequency ?
what is compressive strength of bricks?
cement and sand required for one block of size 0.23*0.15*0.46
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)