Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to calculate the chair reinforcement length in slabs, footing or anywhere??
sir how can we find the cement and sand required for making 4" drop
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How many % we consider for lap for reinforcement for estimates
What are the advantages of cad software’s?
which type of instrument included in plumbing work?name of instrument?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
Will going from a 3-tap to 6-tap increase water pressure?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what is concrete canvas?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure