Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the Task work of different labour.?
i need gate exam civil engineering question papers with answers
How do we determine the specific gravity of a cement?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
why the openings of sieves are square io size?
How cracks in concrete can be avoided?
What is the difference between linear dimension and aligned dimension?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How to calculate woden area in sft and Cft
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?