Answer Posted / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
how to do sudoko puzaals?
how to calculate the weight of concrete
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What is need for setting limits?
Define What is a projection line?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
150mm bricks size how many use 4.14 m3
Wats the formula of eccentric footing and how was calculated from concrete qty
what is diffrence between catchment area,watershed and basin?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton