Why we stop the concrete in 1/3 rd of span length
Answer / anuranjan kumar
after l/3 tesion zone develope in mid span so always stop concreting with in l/3
| Is This Answer Correct ? | 13 Yes | 2 No |
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
For what building Built-on balconies are preferable? What are the advantages?
Why is DPC not provided at sills of doors?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
it is a corrected question." make a list of engineering property(properties) of soil.
0 Answers AAI Airports Authority Of India, DLF,
Can anyone tell me the thumb rule for calculating structural steel quantity?
rate analysis of shuttering
Please let me know the simplest way of Calculating mix designs for any grade.
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
what is the weight of 6000 psi concrete in lb/cft?
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)