Why we stop the concrete in 1/3 rd of span length
Answer / anuranjan kumar
after l/3 tesion zone develope in mid span so always stop concreting with in l/3
| Is This Answer Correct ? | 13 Yes | 2 No |
what is the service corridor?
Which IS Code describe the industrial flooring?
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
Which is the best book for building construction?
what is the coefficient for running feet to cft coversion both area and price
how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
1 Answers LiveCon, Sobha Developers,
what is the cut length for Fe 500?
How did street originate in the plumbing term street ell?
how to calcalate for roof beams & slab reinforcement design specified?
Stringer How many cm goes to landind
Describe the role of independent Quantity surveyor?
How to decide the Lap Length in Steel Reinforcement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)