calculate the cost for AAC block wall of 15cum?
Answers were Sorted based on User's Feedback
Answer / aijaz mirza
If we are taking block size (20x20x40)then, 1/.4+.01=2.43
2.43/.2+.01=11.57~12 blocks
Where .01 mortar in mm
.4 is length of block
.2 depth of block
Now for 15 cum area will cover by 12x15=180 blocks
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chirag suthar
>using 6inch ACC block ...55.no.of block used in 1cu.m(cost:3410 for 1cum wall),,,... if ur wall 15cu.m,....so total cost=3410x15=51150/-.
| Is This Answer Correct ? | 0 Yes | 1 No |
What is the slope of vertical wall ? quick ans
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
which tests for concrete pouring period at the site?
How to take steel quantity for beams ?how to calculate stirrups
what is the difference b/w GSB and WMM?
Please tell me 1 Sqm Steel 14mm center to center .200,.200
"Why you consider yourself suitable for the post"
17 Answers Banking, CSE, IIP, IREDA, L&T, Maytas, McHugh, Nations Trust Bank, Teaching, Techkriti IIT Kanpur, Xantium Integrated Solutions,
what is the hanekom repairing material after concreting work
how much nails used in 1 sq m shuttering
16 Answers L&T, Pearls, Simplex,
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)