Why we stop the concrete in 1/3 rd of span length

Answer Posted / anuranjan kumar

after l/3 tesion zone develope in mid span so always stop concreting with in l/3

Is This Answer Correct ?    13 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1891


What does civil engineering mean?

648


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1626


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1170


For what purpose bedding is used under storm water drains, explain?

743






Define angular dimension?

665


In which code the the maximum height of concrete casting has been explained

2329


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1588


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1424


How many litres of water used for curing of 1000sqft of slav

1018


what is tension & compression of steel bending.

1835


at which depth the construction of tunnel is economical from cost and engineering aspect.

1310


give me the rate analysis for Bituminous Macadam and SDBC

6938


what discoveries did you have in relation to your course?

1655


In cement making,what is meaning of blend,fineness,density. 

2979