1)What's are the diff. types of column based on loading?
2)Is there any difference bitween Development length &
Anchorage Length?
3) What is the basic diff. between one way & two way slab?
4) Where should use OPC & where should PPC?
Answers were Sorted based on User's Feedback
Answer / azri
3)if length width ratio less than two it s called as two
way salb and if length width ratio higher than two it s
called as one way slab.
| Is This Answer Correct ? | 23 Yes | 1 No |
Answer / ptcool
1.
Based om types of reinforcement
1) Tied Columns
2) Spiral Columns
Based on type of loading
1) Columns with axial loading
2) with uni axial eccentric loading
3) with bi axial eccentric loading
Based on Slenderness Ratio
1) Short Columns (lx/D and ly/b <12)
2) long(Slender) Columns
2.
Development length is the length overlap of bars tied to
extend the reinforcement length. is about 50 times the dia
of bar is consider to safe.
Anchorage length- this is the additional length of bar
req to insert in another at the junction. For example-
Main bar of the beam in column at beam column junction.
this length is simiilar to the lap length.
3.
when the ratio of longer span to shorter span is less than 2
is called two way slab and the when it is greater than 2 is
called one way slab.
4. opc (ordinary portland cement) settle quicker than
ppc(portland pozzalano cement). the curing period for ppc is
greater than opc.
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / vigneshwaran
1. ly/lx
(value) > 2 Is
one way slab, <
2 then its two
way slab. 2.
Column depends
uniaxial,
triaxial column
due to acting
the load i.e
eccentricity 3.
OPC - ordinary
portland cement
used all
concrete and
cement related,
PPC- portland
posalana
cement- used
for except
concrete works
| Is This Answer Correct ? | 3 Yes | 3 No |
How much pressure will be drop when we apply the P.R.V. In the upvc downtake for stilt 28?
what is mean by bulking of sand?
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
calculate if the size of the beam is 300*500 then L for the top & bottom bar
What is the use of offset command?
please send me bhel questions on rupesh.017@rediffmail.com
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
1 Answers Ascent Constructions,
whats are the max value of providing of super-elevation in road way in various condition?
Steel calculation formala for column,beam and slab.
pls give me ans to ACT formula cube testing porpuse
What is the strength of cement?
how to convert m 25 concrete to m 40?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)