10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
Answer Posted / neeraj
The quantity of cement req.Is.0.055 cubic meter or approximately 1.58 bags of cement.... And the number of bricks loaded in truck is approximately 2857 bricks
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How to find permissible diagonal tensile stress in reinforced brick work
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
explain five benefits of using standard terminology in the measurement process?
How much is the cover for slab?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Dear Sir What is the Contraction joint for base Slab
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
how calculate the bearing from two coordinates?
What are the uses of alloys in daily life and how are alloys made?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Why are pull-out tests performed for soil nails?
How many pyramid in egypt?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
how to absorb to site basic corrections? which are the important correction?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations