Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In three phase, phase to phase voltage is 440 Volts, but the three phase motors are designed for 415 Volt, 50 hz, why



In three phase, phase to phase voltage is 440 Volts, but the three phase motors are designed for 415..

Answer / pammi.kumar@ymail.com

415 + - 10 %  is moter.

Is This Answer Correct ?    6 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

exact difference between electronicsand electrical

5 Answers  


Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!

0 Answers  


Do these factors (settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot)) are the part of first order, second order, higher order, linear, non-linear, open-loop, closed-loop, homogeneous & non-homogeneous systems ?

1 Answers   Limton,


What happen when ct secondary are open circuited? why same thing is not happen in ordinary transformer?

3 Answers   BARC,


i have 500 amp inductive load of motors ,,,pleas tell me how can i calculate for capacitor bank for improving my power factor to 99 .....calcullations for capacitor bank,,,,

0 Answers  


How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?

1 Answers  


21. What is the purpose of taking Capacitance and Tan Delta Test in Transformer bushing? 22. What are the protections to be used for Generator? 23. Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0 24. What happens when the polarity changes in CT? Explain briefly? 25. Explain the Term in CT Name Plate – Class: 5P10

3 Answers  


what are transmission line parameters and transmission line constants?

1 Answers  


The normal highest generated voltage in India is a) 6.6KV b) 132KV c) 11KV

13 Answers  


How to generate neutral in DG set?

3 Answers  


3) How earthing is done? How it measured? Write the method for earthing? How the earth resistance is kept low?

1 Answers   Innovative Energy,


how to compute kvar in substation feeder to improve power factor and sending voltage

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)