In Rcc work what ratio we need?

Answer Posted / adesh kumar

The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
 M 15(1:2:4),
 M 20(1:1:5:3),
 M 25(1:1:3)

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1511


Please design 12.5m long dubbly beam

1472


what does the track parameter mean in staad.pro?

5454


What is the diameter of the 3"inch nails?

1519


how to calculate the size of triangular ring in rcc column?

1347






HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

967


five benefits of using standard terminology in the measurement process

2858


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

691


how to calculate the weight of concrete

1023


what is polity

1650


When was the first motorway built in england?

650


What is the difference between Hinged and pinned in Column ends

4782


What is change order request?

674


What are the different types of civil engineering?

647


how to calculate quantity of bricks in circular manhole with examples.

4990