Answer Posted / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How to fix toll charge for a particular vehicle at toll booths in a highway?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
how to calculate the concrete mix m30 by volume
What applicable rate of wct in bihar
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
How much does the leaning tower of pisa lean?
What are segregation and bleeding?
whaat is blister in box girder bridge and what is its function..
how much cost of single coat 20mm thick plastering per sqre meter
what would be the design load of R.C.C Cooling tower per cell.?
punj loyed and sapurjl palanjl
What is the difference between built area and super built up area?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
What is the crank length in the slab?