BREAKERS. (M.V,H.T) RATINGS
Cromption Greavies. 125A.250A,400A,1000A,1250A
Siemens. 125A.250A,400A,1000A,1250A
L&T. 125A.250A,400A,1000A,1250A
ABB. 125A.250A,400A,1000A,1250A
TRANSFORMERS.
Kirlosker. 750 KVA,1250KVA,2.0 MVA
Indo tech. 750 KVA,1250KVA,2.0MVA
Cromption Greavies 750 KVA,1250KVA,2.0MVA
,
| Is This Answer Correct ? | 18 Yes | 7 No |
BREAKERS. (M.V,H.T) RATINGS
GENERAL ELECTRICAL(GE) 125A.250A,400A,1000A,1250A
Cromption Greavies. 125A.250A,400A,1000A,1250A
Siemens. 125A.250A,400A,1000A,1250A
L&T. 125A.250A,400A,1000A,1250A
ABB. 125A.250A,400A,1000A,1250A
TRANSFORMERS.
Kirlosker. 750 KVA,1250KVA,2.0 MVA
Indo tech. 750 KVA,1250KVA,2.0MVA
Cromption Greavies 750 KVA,1250KVA,2.0MVA
| Is This Answer Correct ? | 9 Yes | 7 No |
Answer / jigar m bhojani
rating of circuit breaker is in kv , rating of transfomer and generator is in kva , rating of turbine is in kw , rating of boiler is in tone per hour and rating of transmission line is kv or kw
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / jitendra
the meaning of this Qus is that what make is being used in ur company.
so the Ans is.
Generator:
we r using Cummins make And Rating is 1010kva
Transformer:-We use 3 Txs which ratings is 1010,1500,2000kva and made by Areva,L&T,Kirloskar etc give name which has been using ur company..
Breakers:
we r using ﹰDifferent kinds of breaker whicha ﹰRating and made as
ﹰMﹰCﹰB- Rating
6,10,25,32,63 amps and made by Schneider,Abb,Lt,Siemens
MCCB rating:
100,250,400,600,800 amp and made by Abb,seimens,
ACB:
1000,1500,1600,2000,2500 til 4000 and made by Same as above company.
this is A real ans and i Hope its Make U better 😊
my Instagram id :-@Iamjitendrajha
| Is This Answer Correct ? | 0 Yes | 0 No |
why transformer measures in kva
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what is the differance between MC61C and MC61A relay of L &T make.
A well system is when , no. of bus bar is less or more. Tell me the concept of it.
At which time Synchronous generator act as a Synchronous Condenser?
why dont we use the same pylon to carry 400 kv plus 220kv and 33 kv ?
2 Answers Focus, Focus Energy,
Why does the DC voltage needed is less than AC needed to produce corona?
what are the 4 rules to start the motor?
In vapour absorption refrigeration machine fluids used are
how to set the overload setting in the thermal overload relay?? is there any calculation in that??
what is power factor? whether it should be high or low? why?
PLC Based Process Automoation Panels?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)