How to calculate stirrups cutting length in columns
Answers were Sorted based on User's Feedback
1) let cover for column be 40mm (as u have not mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN-2XCOVER=400-40X2=320MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-40X2=170MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X320+2X170 + 24X8 =1172MM=1.172 meter
2) given cover 25mm (as u have mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF BEAM-2XCOVER=400-25X2=350MM
B=SHORTER LENGTH OF BEAM-2XCOVER=200-25X2=150MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X350+2X150 + 24X8 =1192MM=1.192 meter
NOTE SLAB COVER HAS NOTHING TO DO WITH CAL.OF STIRRUPS
3) ASSUME cover 30mm (as u have NOT mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN/2 -COVER=400/2-30=170MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-30X2=190MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X170+2X190 + 24X8 =912MM=0.912 meter EACH
Generally term stirrups are used for lateral tie for beams while term ring is used for columns.calculation of length for stirrups & ring are same. Stirrups length depend upon size of column/beam,cover,dia of stirrup's bar.Nominal cover is measured from outer face of stirrups to concrete face.Although this cover at site is measured from outer face of main bar.If cover for beam is 25 mm then, for 90 degree hook for 600x400 mm column & 10 mm dia bar as per IS Code 2502 length will be=2[(600-2x25)+(400-2x25)]+20x10mm=2000...
If there are four bar of 20mm dia on 600 mm face then for central stirrup of this side will be=[600-25-25-(20/2)-(20/2)]/3=176.66 between centre of two bars of this face,now add (20/2)+(20/2) so that outer face to outer face of 20 dia bar=196.6say 197mm. same way other side of central stirrups are calculated & then add 20 times bar dia.Add 24 xdia of bar for 135 degree hook
In IS code formula=2(A+B)+20 x bar dia. A & B are internal distance between stirrup side.
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / sfz ans
above answer plus bent deductions at every bent (IS 2502)= cutting length.
ie: for columns (2A+2B)+(24D)-(kDx4)
k= 2 upto 25mm tor steel
| Is This Answer Correct ? | 3 Yes | 2 No |
The difference between Centering & Shuttering is –––
How to calculate plastering for elevated water storage tank
how much quantity of cement bags are required to fill the one m3 of empty container.?
12 Answers L&T, NBDL, SEW Infrastructure,
how to calculate the volume of water in the water tank (5'x5'x5')? what"s the formula?
15 Answers Fire Safety, MAHINDRA, New Star Construction, Shankar Electricals,
bulkege of concrete for design mix concrete for grade m30
what is the thickness of plasters on the external and internal walls at site in india???
what is E <MOE> VALUE FOR WOOD
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
in the footings first which reinforcement bar has to be layed as per design criteria.
give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)