Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate the quantaty of steel in footing please show
me detail procedure with the help of drawing

Answers were Sorted based on User's Feedback



how to calculate the quantaty of steel in footing please show me detail procedure with the help of..

Answer / mohammed abdul moid

Take footing F= 4 No's size 1.2m*1.2m. and 6No. of
16mmbars
take bottom bar 1.2m and depth 0.5m
Total length L= 1.2+0.5= 1.7mt*1000= 1700

Formula =[3.14*0.00000785*16/2*16/2*1700]*6(No of
bars)
=[3.14*0.00000785*8*8*1700]*6
=[2.6818]*6 = 16.09
=[16.09]*2(Top n Bottom bars)=32.08
=[32.08]*4(No of footings in plan)
=[128.72kgs]

Is This Answer Correct ?    2 Yes 2 No

how to calculate the quantaty of steel in footing please show me detail procedure with the help of..

Answer / mutual basha baig

Qty of steel(in kgs) =no.of bars×length of bar × unit wt of bar ×simillar objects.

@unit wt of bar =diameter of bar/162.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what are the CAD software versions you have used?

12 Answers   ERA, IES,


what is the praposion of M30 concrete mix.

6 Answers  


What are causes of cracks in outside plaster of a building and how we prevent it during constructions?

6 Answers  


why elongation index is not required for concreteing coarse aggregate..

2 Answers  


What is meant by Friction Pile?

4 Answers  


What is Architect-Prepared Contract?

0 Answers  


How many number of cement bags per running metre are required to cast pileof M-20 grade

1 Answers   Mantena,


How we calculate the actual diameter of the TMT Steel

8 Answers   Brigade, Kalpataru, Simplex,


Quality control

1 Answers   NCCL,


1.what is the main responsibilites of Site Engineer ? and what are main attitude ?

3 Answers   UltraTech,


What out turn civil works

0 Answers  


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)