how can calculate qty of steel required for one or two ways slabs..
Answer / ayaz ahmed
By knowing the area of slab (l*b*t) and spacing between the main and distribution bars ...
| Is This Answer Correct ? | 0 Yes | 0 No |
Prop carrying load capacity
how to find water-cement ratio perfectly proportions M20, M25, M30
What are the joints wants to made in masonry where door opening, arches like etc..
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
convert 1 kilo into brass
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)
How do we test on design and style in a software?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
in the footings first which reinforcement bar has to be layed as per design criteria.
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
0 Answers National Construction Authority,
What is the amount on nails per bag needed for 1m square of wooden form work?
2 Answers Ansal Housing, College School Exams Tests,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)