Why do we provide development length in RCC?
Answers were Sorted based on User's Feedback
Answer / sandeep bhardwaj
There is a new concept that in deformed bars there is no requirement of developement length but this is provided to ensuring the bond between concrete and steel.
Is This Answer Correct ? | 8 Yes | 2 No |
Answer / ananth krrish
Development lenght is provided inorder to prevent overturning of the member.
Is This Answer Correct ? | 9 Yes | 5 No |
Answer / sfz ans
to induce/ transfer stresses from one bar to another or one section to another so that it can act as a homogenous structure
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / sahil
Development lenght means Ld and it should provided to make good bond between steel and concrete.
Is This Answer Correct ? | 0 Yes | 1 No |
what is stub column ?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Any strength is a stress but any stress is not strength
How much lap length provided in compression and tension in bridges?
what is the proportion of M25 geade cincrete.?
how many brick in 1 cubic meter with mortar ?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
0 Answers First American Corporation, GS Infra, L&T, Real Sociedad,
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
indian standard split spoon sampler
how do you stabilize a waterlogged area in road construction
In earth work 1300 cum soil how to calculate how many liters require in water