What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
No Answer is Posted For this Question
Be the First to Post Answer
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
how can we calculate costing of a project per sqft/sqm
1 Answers Associate Consultant, AVT, L&T,
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
How do you determine or evaluate success?
what is the I.S. CODE of RCC
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Can i have pumpable mix design for M10 concrete without fly ash with OPC 43G cement?
how calculate cutting length of stell in slab and column? give brif discussion with formula?
3 Answers ATS, Gammon, Pegasus,
what is tensile strength?
How is calculate the cube molt
19. Are you a team player?
for plaster what is the suitable sand.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)