L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
| Is This Answer Correct ? | 8 Yes | 0 No |
I want the technical question with answer for RRB J.E.exam
What is monostable multivibrator?
What is the main disadvantage of two-hole directional coupler ?
How to Create the Node file with 2 E1 (4+4+4) & EDAP.
what are radio collars?
What is schottky diode?
Define what is space charge width?
Explain at what voltage does land line telephone operate?
at the time of doing second year which course can we study..? and where we should study...?
what is the properties of good transformer oil
what is mean by GT?what is the purpose og GT?what is uses of GT?
Why the current in power diode varies linearly rather than exponentially with voltage?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)