L&T APFC Relay model etacon L8 fault:
Initial power factor is 0.6
when capacitor is on, the value of power is getting down,
please let me know the reason and rectification details.
Answer Posted / ramesh
L&T make etaCON L8 CAPACITOR BANK plant running time pf ok, plant shutdown time using 50nos tube light load pf 0.257,The capacitor bank not in service, programme procedure connect capacitor 5kvr
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
On what parameters does the free running frequency of vco depend on?
Which uplink/downlink spectrum is allocated to DCS-1800?
The output of a 60hz full-wave bridge rectifier has a 60 hz ripple. It this circuit working properly?
Differentiate between microcontroller and microprocessor.
Explain the output of the lexical analyser?
Why is sio2 layer formed over the entire surface in a monolithic ic?
The effect of reheating is
By referring to the barkhausen criterion and conventional circuit's analysis,show that for the Wein Bridge oscillator to oscillate,the voltage gain (Av) of the op amp must be set to 3 and the feedback ratio must be 1/Av.. Anyone, please help me!
In a mosfet, what does the pinch off voltage refers to?
Define voltage controller?
what are radio collars?
how do link aT1 from the 1st BTS to 2nd BTS4?
Describe the working of 3φ fully controlled bridge converter in the rectifying mode and inversion mode. And derive the expressions for average output voltage and rms output voltage?
What are the limitations of the basic differentiator circuit?
We use PSWA card in which case?