what is difference between B.Tech. and B.E. in chemical engineering
Answers were Sorted based on User's Feedback
Answer / ravi pratap singh
In the technical universities such like IIT AIEEE AND STATE GOV TECHNICAL UNIVERSITIES PROVIDE B.Tech Degree and the universities which have the art science along with engineering department provies B.E degree. there are not so big diffrence in syllabus of both b.e and b.tech
| Is This Answer Correct ? | 11 Yes | 1 No |
Answer / solanki chirag
i find that the major difference between them, is only suffix tech and .e
because all books ,all courses are same but only students study under expert teacher .....
and talking about them technical thing so technical knowledge also offered by industry ...in our training period .........
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / rajesh kumar
b tech in che engg is more concerned to practicals,whereas in BE it is more concerned to theoretical
| Is This Answer Correct ? | 8 Yes | 10 No |
what are the major problem comes in the production process
2 Answers Atul, Deepak Fertilisers,
Can you pls tell me how to calculate the amphere rating of cable in case of three phase supply but all load is single phase
Question 35 – A mixture consists of benzene (B), toluene (T) and xylene (X). At a temperature of 353 K, the data of vapor pressures : B : 754.12, T : 289.71, X : 91.19. Unit is mm Hg. The pressure P is 0.5 atm. The value of k for each substance is k = (vapor pressure) / P. (a) Calculate k for B, T and X. Let L / V = 0.65. (b) By using the equation V = F / [ (L / V) + 1 ], find the value of V when F = 100, then what is the value of L?
How does a chemical get ignited without external heat source on reaching its auto ignition temperature
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.
Question 30 – Solve the simultaneous equation using simple Excel program : r + s – t = 7, 2r – s = 0, 3r + 2t = 15. Explain the use of functions of MINVERSE and MMULT together with the keyboard C (Ctrl) + S (Shift) + E (Enter).
can anyone send me the written test paper of Indian oil corporation ltd. My email id is pratuljakhmola@yahoo.com
What is maximum recommend pipe velocity for dry and wet gases?
What is the principles of crayogenic expansion turbin
marketing procedure of iocl
Can large temperature differences in vaporizers cause operational problems?
What is happening when paint dries?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)