Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate the quantity of cement,sand,aggregate for the area L*B*T
are 15.24 m*21.36m*0.12m in the ratio 1:2:4
can any ine explain in detail by using formulas.
Thanks in advance

Answers were Sorted based on User's Feedback



How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m..

Answer / karthik rajendren

Volume of Concrete = 15.24*21.36*.12 = 39 Cum
For 1:2:4 , Req.Cement Bag = 6.46 Bag/Cum , Sand = 0.44 Cum
, Agg =0.88 Cum.
For total Requirement,Cement = 41*6.46=264.86,Sand =
.44*41=18.04Cum,Agg=.88*41=36.08 Cum

(5% wastage's for Concrete is considered)

Is This Answer Correct ?    9 Yes 6 No

How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m..

Answer / navjeet kumar

mixed grade 1:2:4(cement:sand:aggregate)
sum=1+2+4=7
volume of concrete=15.24*21.36*0.12=39.06cum

requirment of cement=(1/7)*39.06=5.58cum
requirment of sand=(2/7)*39.06=11.16cum
requirment of aggregate=(4/7)*39.06=22.32
you can check right or wrong by =5.58+11.16+22.32=39.06cum
so right

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

Concrete how muvh strenght gain 7days,14day,s,21day's,28day's&56day's after curing

3 Answers  


How many types of traps are used?

1 Answers  


wat happens to the foundation when only live & dead loads are considered( wind load is excluded) during the design of tall structures. options are: a)only settlement in the internal structure and not external structure b)only settlement in the external structure and not internal structure c)no differential settlement d)none of the above

4 Answers   BBJ Construction, IOCL,


explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting

0 Answers   ACME,


m25 water cement ratio calculation

1 Answers  


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

0 Answers   Jindal,


Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.

1 Answers  


what is mean by stripping?

2 Answers  


Sir please Bhel Enigineer trainy test papaers in civil engineering

1 Answers   Bhel,


2. What are the grades of steel used in the concrete design?

6 Answers   MEIL, PECL, Ramky,


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

0 Answers  


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

0 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)