Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate the quantity of cement,sand,aggregate for the area L*B*T
are 15.24 m*21.36m*0.12m in the ratio 1:2:4
can any ine explain in detail by using formulas.
Thanks in advance

Answer Posted / karthik rajendren

Volume of Concrete = 15.24*21.36*.12 = 39 Cum
For 1:2:4 , Req.Cement Bag = 6.46 Bag/Cum , Sand = 0.44 Cum
, Agg =0.88 Cum.
For total Requirement,Cement = 41*6.46=264.86,Sand =
.44*41=18.04Cum,Agg=.88*41=36.08 Cum

(5% wastage's for Concrete is considered)

Is This Answer Correct ?    9 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is Bearing Capacity,How to determine it?

1202


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

2199


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2667


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

2013


what is grade intersection?

2022


what is the relation between pitch of steel and depth of slab?

3344


What out turn civil works

6752


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1586


what is stressing

6536


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2546


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2676


What is the difference between absorption & adsorption and sorption?

1136


how many digree of freedom in four bar chain

2350


What is the name of this multiplication factors ?

2086


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

2572