Why we are using PLC instand of DCS in ESD System? can u
explain any one?
Answers were Sorted based on User's Feedback
, Instrument Index, P&ID review, I/O schedule, datasheet, DCS / Analyzers specifications, loop diagrams, hook-up drawings.
In oil & gas industries and petrochemical industries, there are classification of zones like zone 0, zone 1, zone 2. Is there any differences in voltages or power supply supplied for the process instruments, control instruments depending on the zones
what is difference between E/P positioner and I/P positioner. Why E/P fixed in below actuator and why I/P fixed in other place
how do calibrate the valves.. with clear manual
DCS marshilling Cabinet Power supply can be replace during plant running time?
With N nodes and B branches what will have a network ???
how to convert MA in to measuring values..and how mwasuring values into MA ?..plz ansr.i have intervw
What is rtd output signal
what is the difference in Kg/cm2 and mmwc?
What is cascade control in process instrumentation?
4 Answers Engineers India, ITC Infotech,
what is IEC code in cables & how to selecting cables?
few questions on RS 232,1 question on relationship of impedance and turns ratio, many questions on flowmeters
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)