Stepwise process of Northern grid failure in 2012!? (dont
copy paste from wikipedia)
Answer / mebin g mathew
According to the report, Some of the high voltage lines of
Northern Grid were under maintenance and hence the other
lines were highly loaded EVEN 400kv line was used to
compensate the power shutdown of 765 KV LINE. So the 400 KV
line was highly loaded. Due to this the, line tripped and
this worsened the condition load bearing problem for the
other line since all the power requirement came to other
lines. They also started tripping in power swing and some
relays even detected zone 3 tripping(false tripping).
When a huge load was released, the power plant had to shut
them down to protect the generators and other equipments in
plant. A power plant require hours to reignite and start the
production in full flex. And there was a panic to
immediately start production because all were shocked of
the incident.
So thus the norther grid was isolated from other region
grid. That led to a complete black out in North India.The
report ends with an interesting statement that this might
have happened due to hacking of powergrids PLC engineering PC.
| Is This Answer Correct ? | 3 Yes | 1 No |
1.What is effect of capitance in transmission line? 2. After raising the voltage at receiving end what will be happen? 3.how we nullify or control the raised voltage at receiving end?
Why donot sleep below the tree for night time?
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)
why we ground the scondary of current transformer.
how does a current carrying conductor posess a magnetic field. what is the reason for the production of electro magnetic field around the conductor
why m and c are shorted in wattmeter
In India,we use 230V,50HZ,where as many other countries use 110V,60HZ what r d advantages and disadvantages of each of them?
why is efficiency of transformer more than that of other rotating machines?
what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?
what is difference between 3.5 core and 4 core cable
why power generate in 33 kv it will be step down by 11 kv .
What are the two types of transistor and how they are made?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)