in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
which Indian standerd code is used for billing
4 Answers Desai Construction, DLF, NKG Infrastructure,
Define What is Civil Engineering?
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
how many material required for brickbat water proofing of toilets.
what"s the M book?
Rigid pavement Load in tyre preesure It Means KG
what is cross hair cursor?
What letter follows after these, O, T, T, F, F, S, S, E, __?
Formula for calculating the volume of bulb in underreamed pile
What is the maximum distance between the stirrups?
how can we calculate steel value, depending on load
I want to know about history of civil engineering?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)