in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is meant by 'zero value' in quantity surveying.
10 Answers DLS, Gammon, HCC, NCC,
10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
What is the use of array command?
What is cementation
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
How to calculate compressive strength of concrete cube dencity
5 Answers Shoba Devlopers, Sobha Developers,
how much cement is contained in 1:5 ratio 4" brickwork for 1 sqft
what is BPM in concrete demolition hammers. what is better a higher value or lower
what is difference between curtain walling and glazing and spider system which are using in building external finish systems.
define quantity of each ingredient in 1:3:6 mix concrete by volume?
0 Answers NJS, Pratibha Industries,
While casting slab at what length slab casting should be stop