100 cubic meter of concrete will contain how much amount of
cement, sand and aggregate to form a mix of M15
Answers were Sorted based on User's Feedback
Answer / yogesh jadhav
m15(1:2:4)
100cum given
wet volume of concrete=30%more than dry volume
=1.3*100=130cum
wastage=20%of wet volume of concrete
=1.2*130=156cum
volume of cement required=156cum/1+2+4=22.28cum
1 bag of cement=35 lit=0.035cum
no of cement bags required=22.28/0.035=636.57=637bags
sand rqd=2*22.28=44.56cum
coarse agg reqd=4*22.28=89.12cum
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / sjtbehera
For3 100 cum
Aggregated- 88 cum
Sand-44 cum
Cement- 22cum. 660 bag
| Is This Answer Correct ? | 18 Yes | 7 No |
Answer / channa
1m3 of dry concrete = 1.54m3 of wet concrete
Concrete work to be done=100×1.54=154m3
Cement=(1/(1+2+4))×154=22m3
Wkt, density of cement=1440kg/m3
Mass of cement=1440×22=31680kg
No of cement bags= 31680/50=634bags of cement required
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vishamvar
For 10cum of M15 (1:2:4)
concrete 15.2cum dry weight
is require thus
for 100cum concrete
approx. Quantity of material
will be
Cement = 21.71 cum
Sand = 43.43 cum
Aggregate = 86.84 cum
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ajit kiling
For 100 cum work
For m15 grade of concrete (1:2:4)
Dry mortar of 1cum =1.54cum For 100cum= 100*1.54
= 154cum
Cement=154/(1+2+4) = 22cum
Sand= 22*2=44cum
Aggregate=22*4=88cum
| Is This Answer Correct ? | 2 Yes | 0 No |
What is the neutral axis depth factor formula
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
What is the largest concrete dam in the world?
What is the per cu. mt. price of ready mix in Gujarat region.?
difference between limit state method and working stress in terms of load
for 1cum how much bag of cement is used for M20 grade
Rigid pavement Load in tyre preesure It Means KG
what is project planning
the min diameter of steel used in footing are
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)