100 cubic meter of concrete will contain how much amount of
cement, sand and aggregate to form a mix of M15
Answers were Sorted based on User's Feedback
Answer / yogesh jadhav
m15(1:2:4)
100cum given
wet volume of concrete=30%more than dry volume
=1.3*100=130cum
wastage=20%of wet volume of concrete
=1.2*130=156cum
volume of cement required=156cum/1+2+4=22.28cum
1 bag of cement=35 lit=0.035cum
no of cement bags required=22.28/0.035=636.57=637bags
sand rqd=2*22.28=44.56cum
coarse agg reqd=4*22.28=89.12cum
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / sjtbehera
For3 100 cum
Aggregated- 88 cum
Sand-44 cum
Cement- 22cum. 660 bag
| Is This Answer Correct ? | 18 Yes | 7 No |
Answer / channa
1m3 of dry concrete = 1.54m3 of wet concrete
Concrete work to be done=100×1.54=154m3
Cement=(1/(1+2+4))×154=22m3
Wkt, density of cement=1440kg/m3
Mass of cement=1440×22=31680kg
No of cement bags= 31680/50=634bags of cement required
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vishamvar
For 10cum of M15 (1:2:4)
concrete 15.2cum dry weight
is require thus
for 100cum concrete
approx. Quantity of material
will be
Cement = 21.71 cum
Sand = 43.43 cum
Aggregate = 86.84 cum
| Is This Answer Correct ? | 5 Yes | 3 No |
Answer / ajit kiling
For 100 cum work
For m15 grade of concrete (1:2:4)
Dry mortar of 1cum =1.54cum For 100cum= 100*1.54
= 154cum
Cement=154/(1+2+4) = 22cum
Sand= 22*2=44cum
Aggregate=22*4=88cum
| Is This Answer Correct ? | 2 Yes | 0 No |
What should be percentage of silt content in sand?
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
what is the detention period for oxidation ponds
What is civgl engg?
Cement Co-eff. in block 1:6, brick1:4 work?
What is pile foundation?
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
What is the usage of zoom command?
Concrete how muvh strenght gain 7days,14day,s,21day's,28day's&56day's after curing
How many feet are in 4 square yards?
DESIGN OF TRUSS ELEMENTS
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)