100 cubic meter of concrete will contain how much amount of
cement, sand and aggregate to form a mix of M15
Answer Posted / channa
1m3 of dry concrete = 1.54m3 of wet concrete
Concrete work to be done=100×1.54=154m3
Cement=(1/(1+2+4))×154=22m3
Wkt, density of cement=1440kg/m3
Mass of cement=1440×22=31680kg
No of cement bags= 31680/50=634bags of cement required
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What do you mean by honeycomb in concrete?
I have an span length 16 ft c/c
use ofr concrete as per grade ?
what is the use of water bar in water tank and is this an extra item in estimate?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
how to control PQI (Project Quality Index)
what is the types of surveying?which type of survey carrying for type of work?
Minimum and maximum size of the building components
What black man invented the clothes dryer?
How you can turn off the display for dimension in CAD?
What are the uses of groynes?
why demand factor less then 1 ?
What is aggregate?
How is the leaning tower of pisa supported?
How much cement is require in one sqft area in a G+3 residential construction.