Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why Subcritical has 60% condenser capacity



why Subcritical has 60% condenser capacity..

Answer / k r kumar ranjan

Normally In Coal based thermal power plant(Either Sub or Super Critical) 60% Bypass is adopted based on condenser heat load calculation keeping 0.9 as Condenser Cleanliness Factor.
If Some designer wants to bypass 100% of generated steam, it is also possible. In fact most Nuclear Steam Turbine adopt same for same reactor shutdown process.
Increase in % capacity of bypass system increases capital cost involved in condenser cooling surface, Extraction pumps, LP Heaters, Pipe Sizing etc.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

0 Answers   UMT,


What should be the neutral and body grounding sysytem for grid (132 KV) parallel generators (440 volts)?

1 Answers   Rahimafrooz,


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

0 Answers  


What happens if lizard comes in a MOCB

1 Answers   ABB, Reliance,


what is need of primary water system in power plant?

1 Answers   JO, MPL,


Is it not bad to bleed steam from turbine stages before utilizing its energy.

2 Answers  


how shall you calculate PLF on the basis of percentage auxillary load factor

6 Answers  


1 TPH how many Megawatt ?

5 Answers   Pioneer Labs, PSAL,


LAPT working in alternator / generator

0 Answers   Power Plant,


thermal power plants in steam using inlet of turbine.inlet of turbine pressure and flow is same as boiler feedpump why not use direct to turbine?

6 Answers   IBPIL, JSW,


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

0 Answers   Aevitas Pharmagro,


If a pump has "N" no .of conections in the discharge. If a connection has a heavy leakage. Then it's motor current get affected or not??

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)