Construction joint of beam & slab is provided at––
Answer Posted / nilesh kulkarni
L/3 zone of span length of beam or slab
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is the tallest man made structure in the world?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
How to calculate carrying capacity of the existing water supply trunkmain
how to conversation of all construction material in to brass
what is the construction cost for per cft of multistorryed building in kolkata?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
is basic cost of the material includes tax?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
How to design staircase.plz tell me formula for the design the staircase.
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
what will be price of 1:2:4pcc per kg?
how to remove the quantity of metal 1 and metal 2 in concrete
what is m30 in concrete tiles