Construction joint of beam & slab is provided at––
Answer Posted / nilesh kulkarni
L/3 zone of span length of beam or slab
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
how to caliculate required amount of cement and sand required for 1cu.m.
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What is Time period of a building and its relation with frequency ?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Who name us Engineer & Why?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
give me the rate analysis for Bituminous Macadam and SDBC
how much of the strength comes from post-production curing
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
whaat is blister in box girder bridge and what is its function..
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.