Rigid pavement Load in tyre preesure It Means KG
Answers were Sorted based on User's Feedback
what is zero slump concrete
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
how to calculate the loads on slab? what are the steps?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
1. How do you handle non-productive team members?
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
how to find ssm in foundation?
percentage of steel in one cubic meter of concrete
What is the size of a standard room?
How to design a beam without any typical(tuff) calculation. Answer Only by using site practical knowledge?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)