why the horizontal crack occoured in the joint between
brick work and lintel?pls. give clarification???

Answers were Sorted based on User's Feedback



why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarificati..

Answer / lakshmikantha

Brick and concrete are not homogeneous materials and because
of packing not done properly

Is This Answer Correct ?    2 Yes 0 No

why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarificati..

Answer / vikas sahu

due to not monolithic material,different density and
property of concrete in tempreture it extend.

Is This Answer Correct ?    0 Yes 0 No

why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarificati..

Answer / pranav

because of settlement of masonry, we can avoid it by
constructing last layer of bricks 3 or 7 days after
construction of wall

Is This Answer Correct ?    0 Yes 0 No

why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarificati..

Answer / amar kantak

LACK OF WATERING

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate no of rings in columns & weight of column rings & column ?

3 Answers   Al Tayeboon, HCC,


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

0 Answers  


Sir your company in receiver ment of civil engineering.

1 Answers   Amrapali,


Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone

1 Answers  


what is a louer? and for which purpose it will be used.

3 Answers   GMR,






How to calculate the force on a column of three story building. What should be the base concrete height?.

0 Answers   C&C,


granite tiles laying 60/sq ft.how to convert in sq mt,what is the mltiplying value.

5 Answers  


how much least count of levelling ?

5 Answers   NCC,


Mix proportion of M30 grade?????????

4 Answers  


what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns

1 Answers  


why & what is perchatage we are using fly ash in concrete?

0 Answers   Tulip,


What is mean concrete class c35/20. Here C35 and 20 means?

10 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)