why the horizontal crack occoured in the joint between
brick work and lintel?pls. give clarification???

Answer Posted / pranav

because of settlement of masonry, we can avoid it by
constructing last layer of bricks 3 or 7 days after
construction of wall

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2600


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1149


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1290


What is the zero value in quantity surveying

2010


What is Grid floor and mention its advantages ?

2757






How much cement and sand required for 9"brick wall per square metre

2479


How to make a c++ program that converts any base to base 10?

1616


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1546


What is horizon or horizontal mining?

638


sir, whitch is the best book (writer name) for prepration of gate....

1207


Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??

1909


five benefits of using standard terminology in the measurement process

2858


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2247


what is shuttering co efficient?

1301


what is kribs is supporting?

1591