what happen ehen synchronisation is done at below rated speed
Answer / Dhirendra Singh
When synchronization is done at below rated speed, it may lead to increased error rates, longer synchronization times, and decreased performance. This is because the data transfer rate will be lower than the maximum capacity of the system.
| Is This Answer Correct ? | 0 Yes | 0 No |
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
Technical requirement of Copper earthing over GI earthing.
why we use 110vac in overhead crains? why not 220v, 24v
what is diff. between earthing grid,earthing mess, earting grid?
1 Answers Century Rayon, Emco, Tailor Solution,
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
after syncnhronistion how generator speed controlled by grid
explain all the classes with example
what is the function of fire alarm system?
1.Defination of Graund earth and neutral 2.
HOW TO CONNECT THREE PHASE OVER LOAD RELAY FOR SINGLE PHASE
Why we use Electrical energy rather than any other type of energy, mostly? Explain behavior of open secondary CT and short circuited secondary PT in energized condition?
What are the types of control system?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)