Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are all the pre commissioning activities in WTP in
power plant




what are all the pre commissioning activities in WTP in power plant ..

Answer / rajan pandey

Raw water pump should be ready by which we can take
water to creator.proper cleaning of aerator,clariflocculator
And storage tank.Dosing system like alugm Dosing,lime dosing,chlorine
dosing should be commissioned.ReadyNess of flocculator.fitting scrapper
Fitting .isolation gate operations should be cheated

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

Why attemperation is required in HRSG in a combined cycle power plant?

10 Answers   Tata Power,


why oil filled transformers will be with explosion and fire often?

1 Answers  


What is droop.

2 Answers   Dhampur Sugar Mills, Elaf,


What is critical speed of turbine

6 Answers   Vasavi Power,


what is restricted earth fault explain in details

0 Answers   Greenko, JSW,


what is the real reason than natural draught cooling towers are always in hyperbolic shape

2 Answers  


what is the perfect location for furnace draft transmitter in AFBC boiler?

1 Answers  


under which situation or why restricted earth fault protection operates in out side its zone that is external fault

2 Answers  


what is water consumption rate of water to condense one ton steam in condensor.

1 Answers  


1. what is meant by burner tilting?

3 Answers  


what is need of primary water system in power plant?

1 Answers   JO, MPL,


why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?

3 Answers   Greenesol Power Systems,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)