what are all the pre commissioning activities in WTP in
power plant
Answer / rajan pandey
Raw water pump should be ready by which we can take
water to creator.proper cleaning of aerator,clariflocculator
And storage tank.Dosing system like alugm Dosing,lime dosing,chlorine
dosing should be commissioned.ReadyNess of flocculator.fitting scrapper
Fitting .isolation gate operations should be cheated
| Is This Answer Correct ? | 3 Yes | 0 No |
how many safeties should be present in boiler?what are they?
4 Answers DN, Nandi, Pump Technology, Siris, Thermax,
LAPT working in alternator / generator
what is under voltage protection 27
What is the use of NULL meter on AVR panel
What is reheater protection based on what mft will be act on RH protection
Where is the pressure reduce valve in the power plant
Why we need to maintain furnace and secondary air dp.if it increase or decrease what happens.
I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per liter of diesel. The engines are due for overhauling. is this normal
What happen when the AVR of the generator fails? Will it cause power instability and total failure of the alternator?
In a thermal power plant ID Fans running with full load but boiler load is only 80 % give reason ?
9 Answers Essar, Prumatech, Tata Power,
a gas turbine have how many thermocouples?
What should be the neutral and body grounding sysytem for grid (132 KV) parallel generators (440 volts)?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)