what are all the pre commissioning activities in WTP in
power plant
Answer / rajan pandey
Raw water pump should be ready by which we can take
water to creator.proper cleaning of aerator,clariflocculator
And storage tank.Dosing system like alugm Dosing,lime dosing,chlorine
dosing should be commissioned.ReadyNess of flocculator.fitting scrapper
Fitting .isolation gate operations should be cheated
| Is This Answer Correct ? | 3 Yes | 0 No |
Why attemperation is required in HRSG in a combined cycle power plant?
why oil filled transformers will be with explosion and fire often?
What is droop.
2 Answers Dhampur Sugar Mills, Elaf,
What is critical speed of turbine
what is restricted earth fault explain in details
what is the real reason than natural draught cooling towers are always in hyperbolic shape
what is the perfect location for furnace draft transmitter in AFBC boiler?
under which situation or why restricted earth fault protection operates in out side its zone that is external fault
what is water consumption rate of water to condense one ton steam in condensor.
1. what is meant by burner tilting?
what is need of primary water system in power plant?
why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?
3 Answers Greenesol Power Systems,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)