pls can some one tell me details of coloumn shuttering like
at what distance the supports should be palace and no. of
supports
Answer / shah nawaz
its is depend on column size as size is more should give more support & well shuttering done so that it should not blogged. in residential building column size will be small but in industrial infrastructural column size will be more.
| Is This Answer Correct ? | 1 Yes | 1 No |
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is difference between open and well foundation ?
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
why we take cube depth 150mm for testing
what is the measure of slump
Cost control in civil construction as well as Quality control
the capacity of a storage resevoir can be decided by using
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)