within an emergency scenario what are the safe systems of
work a coss can setup as part of is duties
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate lap,bond and hook length for preparing bar Bending schedule ?
11 Answers L&T, Saudi Aramco Shell Refinery Company SASREF, Sunil Hitech Engineers, Tempus, Zain United Arabian,
What is the amount of brick in cum we get in a BIG LORRY approx ??
why we put pocket in some structure instead of bolt.
In beam where lapping is allowed for top and bottom bars?
1 Answers IOCL, JMC, JMC Projects,
How to get MEP technical,instaaltion & testing data for interview?
1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?
silt%= silt volume/ silt+sand volume is this right?
What is the strength of normal brick in india
Difference between design mix and nominal mix
2 Answers Aegis, CCCL, UltraTech,
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
1 Answers ECR, RRB, Si Precision Moulds,
which tie is used in binding of steel double tie or single ti?
How much stirrups spacing required for.column reinforcement?
3 Answers L&T, Ocean Interiors,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)