what is assumption consumption of steel per m3 for raft
Answers were Sorted based on User's Feedback
Answer / dandamudi tanuj
Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.
| Is This Answer Correct ? | 2 Yes | 0 No |
why the openings of sieves are square io size?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
waht is the range of compacting factor test result for good concreate?
How to Calculate no.of bricks in 1sq.mtr
levelling least count
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How do you calculate reinforcement weight of steel?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is the difference between stress and pressure??
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
what is the rate for per sqm damp proof course
why development length = 50D . why not 100D
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)