what is assumption consumption of steel per m3 for raft
Answers were Sorted based on User's Feedback
Answer / dandamudi tanuj
Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.
| Is This Answer Correct ? | 2 Yes | 0 No |
HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.
4 Answers Ansals, HFCL, Jaypee, Pratibha Group,
what is right & short method of measurement of slab&beam
Deshuttering time for slab 6.15 meter
how to calculate the wind pressure
How to find the material quantity in a cement Sand mortar for Stone masonry?
one cricket ball through in chennai and jaipur same speed where bowl has fast speed
the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles
compression strength of first class brick should be
Explain what is Hybrid Foundation?
How to find concrete quantity for a circular column ?
how tl calculate lap lengh of concrete in different grade of concrete.
How much binding wire is required for one tone reinforcement ?
21 Answers ARS, Gammon, L&T, Lodha, Pratibha Industries,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)