what is assumption consumption of steel per m3 for raft

Answer Posted / dandamudi tanuj

Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between tor steel and tmt steel?

651


What is thumb rule in quantity and cost estimation of a residential building in civil engineering??

2573


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

1861


all technical question

1672


How to increase a bearing capacity of soil?

652






What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4645


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1347


for pretensioning which will yield first and same for post tensioning?

1707


RR masonry rate analysis

2645


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1635


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1148


In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:

2947


i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

2057


Explain the various stages of the project planning process in construction?

701


How to estabilish reinforcement Steel rolling margin for a building projects ?

3644