Answer / subhash
slab=20mm
beam=25
column=40
footing=50
industrial building it is 75
| Is This Answer Correct ? | 0 Yes | 0 No |
how to know rcc strength
In beams why we give lap in middle of top bars and at edges in bottom bars???
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
time and work questions
what in total station list counting
How do you convert wind speed into force?
what is chicken mesh?explain its use
What is line killa
which I.S. code shown wastage in structural steel
what is pure bending.
what do you know that m20,m25
brickwork labour rate per cum ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)