concrete coverings outside steel
Answer Posted / subhash
slab=20mm
beam=25
column=40
footing=50
industrial building it is 75
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
detailed calculation of the amount of cement used?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Define What is passive earth pressure ?
What are the responsibilities of a site manager?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how to do sudoko puzaals?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
explain five benefits of using standard terminology in the measurement process?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
The mixture of different ingredients of cement is burnt at?
where i can get material costs on weekly basis