WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY
EMPLOYED
Answers were Sorted based on User's Feedback
Answer / md.nazimul islam bhuiyan
I'm trying my best to make it a Best Company all over the
world.
| Is This Answer Correct ? | 12 Yes | 3 No |
Answer / s.manjula
I WILL TRY TO INTRODUSE NEW TECHNOLGY FOR DEVELBMENT OF OUR
COMPANY GROWTH.........
| Is This Answer Correct ? | 5 Yes | 1 No |
Company will be in more better situation when I am hired
permanently. I will contributing more than enough in
improving the company and even my co-workers...
| Is This Answer Correct ? | 3 Yes | 1 No |
What are the applications of the modulus of elasticity?
what is the function of GSB all class ?
As per IS 456 2000 Clause 16, table 11, page no. 30, it is written that acceptance strength of concrete is fck+4 for grade above M20. what is the meaning of " Mean of the group of 4 Non- overlapping consecutive test results"
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
how much dry volume of cement in 1cum in m20 grade
Which Types Of Bricks ?
how to find quantity for binding wire steel.
In what construction is concrete grade m35 used?
4 Answers Cipla, High Concrete,
what is right & short method of measurement of slab&beam
Explain the mechanism of cavitations in pipes and drains?
what is the painting co efficient of slope roof tiles?
How many types bend used in civil reinforcing
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)