in a building why we are using T beams?
why can i adopt beam bottom & Top level as same as slab
bottom & Top level?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate cement and sand quantities in cement mortar As 1:1,1:2,1:4,1:6 ?
15 Answers Boss Global, JP Group, Kerakoll, NextGen, Simplex,
How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?
Why should you consider yourself fit to be hired by jindal steel.
Doul Bar reinforcement and details of drawing.
0 Answers Atlanta Infrastructure,
difference between tmt and tor steel
what is the load acting on the sides of the water tank
how to design mix ratio for concrete using M25?
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
how to calculate the volume of water in the water tank (5'x5'x5')? what"s the formula?
15 Answers Fire Safety, MAHINDRA, New Star Construction, Shankar Electricals,
if we have water only for hydration of cement,no water is available for curing of concrete.then how we can do curing of concrete
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)