what is the proedure to do soundness test in cement? What is
the maening of soundness? Why we do it for cement?



what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it..

Answer / ptcool

soundness in case of civil engg means the expansion of cement. it is mainly tested because Certain cements have been found to undergo a large expansion after setting causing disruption of the set and hardened mass. This will cause serious difficulties for the durability of structures when such cement is used. The testing of soundness of cement, to ensure that the cement does not show any appreciable subsequent expansion is of prime importance.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the degree of residential building stair case ?

2 Answers  


Why we provide hair pin for shed

0 Answers   ABC,


what is the lap length for pile reinforcement cage in water piling

2 Answers  


what is Short bored pile foundation.

0 Answers  


how many kg reinforcement is required for G+ 1 roof slab of 1200qf slop slab with 5 inch thickness of house.

2 Answers   Eversendai,






how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl

3 Answers   Thermax,


what is the meaning of TMT Bar and what is benifit of these Bars?

6 Answers   L&T,


after temping in cbr mould keep how many hours mould in water

2 Answers  


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

0 Answers   CECL, HTC,


what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)

3 Answers  


is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.

1 Answers  


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)