Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be
used 1cu.m

Answers were Sorted based on User's Feedback



In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be used 1cu.m..

Answer / karthik .v

1:2:4
cement = 6.35 bag per one cubic meter
= 6.35 x 50
= 317.5 kg

sand = 0.43 cubic meter (or)0.01218 cubic feet

aggregate = 0.86 cubic meter (or)0.02436 cubic feet

Is This Answer Correct ?    16 Yes 6 No

In 1:2:4 ratio how much kgs of cement,fine&coarse aggregates to be used 1cu.m..

Answer / sunita

Cement : 1/7 = 0.1428 cum
0.1428 cum * 2400 kg/cum
342.85 kg

Fine Aggregate : 342.85*2 = 685.71kg

Coarse Aggregate : 342.85*4 = 1371.4 kg

Is This Answer Correct ?    8 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate steel for slab or footings?

0 Answers  


Define What are the uses of alloys in daily life and how are alloys made?

0 Answers  


i need a labour rates of all civil works ? eg) brick,pcc, smm, inner plaster,outer plaster,centering, bar-bending. and also need all material rates latest?

1 Answers  


wat is meant by aerocon bricks?

6 Answers   L&T, Real Estate,


How much cost is required for 1 Flyash Brick?

1 Answers  


How to calculate Cement, Sand and Kapachi required for M20, M25

3 Answers   NCC,


what is the difference between linear and curved elements?

0 Answers   Al-Hamd Academy,


How high should the water tank be to provide a 60 psi at base of this water tower?

0 Answers  


clear cover means the distance between main bar outer face to shuttering face. Is it right?

4 Answers  


How to take measurement of plastering beam and column.

2 Answers  


In built up area basis what is ratio of concrete

1 Answers  


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)