1:2:4
cement = 6.35 bag per one cubic meter
= 6.35 x 50
= 317.5 kg
sand = 0.43 cubic meter (or)0.01218 cubic feet
aggregate = 0.86 cubic meter (or)0.02436 cubic feet
| Is This Answer Correct ? | 16 Yes | 6 No |
Post New Answer View All Answers
Describe Briefly The Various Methods Of Concrete Curing?
what is idealized curve for concrere and steel
Which IS Code/American Code applied for coupler test of steel
what is the difference between np2 and np3 concrete mix
WHAT IS YOUR CURRENT SALARY
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
How to testing voids of filled aggregate in bitumen mix design
Does VDF add strength to the flooring apart from preventing water ingress?
what is meant by shear center?????
What is the difference between a wood shake and wood shingles?
Moisture content calculation for diff mix ratio's ??
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the procedure of concealed plumbing in toilets?
questions with answers to face an interview of an civil engineer regarding RCC buidings