Explain and give me an example of a time when you had to
explain some new procedures to your co-workers for quality
service delivery, how did you go about it?
No Answer is Posted For this Question
Be the First to Post Answer
What are the disadvantages of thermal power plant?
what is the minimum insulation resistance for HT AND LT motor ?
Dear Sir how much cable size required from 0.75 kw to 50 kw for electric motor or pump
while we select CT, why the CT ratio is divided by 5?? ex:250/5,15VA,CLASS-1 CT.Why it is divided by 5??Help me please
how much LT load can bear by the 100 KW HT connection.
Draw a SLD of DG distribution up to main LT panel?
what is extra low voltage system
What is actual name of Transformer oil.
Construction of Diesel generator set?
How to Calculate Contracted Maximum demand using motor Hp or Current
how to claculate the ups load in KVA pls give the if any fourmoul?
they conducted technica for 1 hour..i also managed..they selected 5 boys and only one girl,myself got wait listed.whether they would call or not
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)