how many brick sand cement require (1:5) 1 cum

Answer Posted / ajayzarbade

total no of bricks=500 nos with inc. wastage
& 1cu.m bk.work 33% dry morter then ratio will be use 1:5 so
1/6=0.166m3/0.035

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is flashing?

712


for pretensioning which will yield first and same for post tensioning?

1703


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

1713


What is Time period of a building and its relation with frequency ?

738


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

2011






How and where are aqueducts built?

671


as per is code, what is the minimum content of opc and ppc cement for rcc structure

1737


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

1504


How to estabilish reinforcement Steel rolling margin for a building projects ?

3642


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1176


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2388


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

685


what is the 0 value in quantity surveying

1920


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1701


How is make concrete cube?

695