qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
No Answer is Posted For this Question
Be the First to Post Answer
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
how gradation of aggregates effect on slump of fresh concrete?
what is the difference between GSB & WBM ?
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
how do i find the fixed end moments in the fixed beams with the use of general method?
how much binding wire is reqd for 1 MT
hi frnds i hav got thro BHEL written exam..wat to prepare for intervw..guide me plz!!!!!!!!!!!!!
what is the bearing capacity of hard rock
How many types of traps are used?
what is right & short method of measurement of slab&beam
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)