We normally make oil soak pits under Transformers. Oil from
soak pit goes to collection pit.
We provide granules/pebbles under transformers.
My question is weather granules/ pebbles to be filled in
soak pit or not? if yes upto what level?
No Answer is Posted For this Question
Be the First to Post Answer
Why are calling lagging power factor is a inductive load?
excitation limit of an excitor
I am gokul. i finished B.E(EEE). I have 2 years experience in maintenance. But now i have not job, so i am searching. i want any effective courses in Electrical field with related to job and good salary. any one will help to me. please tell?
WHAT IS THE MINIMUM IR VALUE FOR CABLE CHARGING
help me with the question that might be ask on the interview for technical position
what are d/f between cfl and pl lamps,
why neutral busbar size is half of the phase busbar size in control panels
difference between isolator and circuit breaker?????
what is the necessity of neutral in 3 phase system?
The neutral&earth voltage is 0v.But we were connected the lighting load at the time ballast was failed.why?
What is the temperature PROFILE OF A FLUID W. R. T. Distance from a sphere to which it is IN CONTACT which is at constant temp.?
What is the latest generation of circuit breakers called?
3 Answers Epitome, Focus Energy, Jakson, KDC, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)