why we use condenser in the thermal power plant, althrough
the same vapour will be again heated

Answers were Sorted based on User's Feedback



why we use condenser in the thermal power plant, althrough the same vapour will be again heated..

Answer / lakshmi

in thermal power plants we use condenser for the purpose of
cooling the exhausted steam coming from the turbine.

Is This Answer Correct ?    5 Yes 0 No

why we use condenser in the thermal power plant, althrough the same vapour will be again heated..

Answer / tanmay kumar

in a thermal power plant is must needed because there is no device that transfer steam from one place to another...there is only way to recycle it after cooling the steam to water and transfer/recycle water through a pump.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

what are the safety measure & controls in engine?

2 Answers   RRB,


what is method for testing CT

0 Answers   DCM,


Can we use MCCB with Auxiliary Contact in place of Contactor in a AMF System.

1 Answers   C&S, Farnek,


what role neutral plays in electrical circuit? If neutral is not there what will be the effect

1 Answers  


what is different between neutral and earth?

4 Answers  






why should small green grass ans small plant should not be there inside the transformer Yard in the factories

0 Answers   Riddhi Siddhi,


what type of earthing is done on hilly rocks.

4 Answers  


i want to trigger ATS (Mains +Generator )from external system could any body help me in this regard ?? is it posible if yes please tell me how?

1 Answers  


we all know voltage is a force(emf), and the force always devides if 2 or more than2 loads are there but why does the voltage remains same is parallel, it must devide na ???

0 Answers   NTPC,


what will happen if the frequency supplied is more than the frequency of the instrument...?

3 Answers  


Draw the line diagram of diffretial relay connected to transformer?

0 Answers   NTPC,


why the generator will take 8 to 12 hours to start after it got interrupted due to technical problems in case of power plants.

1 Answers   NTPC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)