Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
No Answer is Posted For this Question
Be the First to Post Answer
what is local scouring?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
1. What type of job are you holding at the moment? Name of present / last employer?
roll of DLC in road constructions
what is the rate for per sqm damp proof course
how many cubic centimeter in one unit of sand?
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?
door and window wood work calculations and different methods
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
what is correct temperature for pouring concrete?
Distinguation between Developing Length and Lapping Lengh
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)